Orbitarium Alerts

GSLV R/B

A spent rocket stage

Where it came from
The launch that carried EOS-05 (GISAT-1A) (India, 2026).
Is it working?
Not a working satellite: a spent rocket stage.

In figures

How high
127–29,584 km. Above the Earth, from its lowest point to its highest.
One lap of the Earth
8.6 hours. 2.8 laps a day.
Launched
3 Sept 2026. On a GSLV Mk II.
How big
2.6 tonnes. At launch: 9.9 × 2.8 m.

In plain English

It was launched on 3 September 2026 by a GSLV Mk II from Satish Dhawan Space Centre, Sriharikota, India, 3 months ago.

It flies in highly elliptical orbit, between 127 km and 29,584 km up, circling the Earth once every 8.6 hours, 2.8 laps a day. Its orbit is tilted 19.2° to the equator, so it passes over everywhere between 19.2° north and 19.2° south and never flies over places nearer the poles. Its speed changes around each lap, from about 10.2 km per second at its lowest point to 1.8 km per second at its highest: an average of 3.8 km per second, about 13,500 km/h.

It weighed about 2,630 kg at launch and is 9.9 m long and 2.8 m across. It was built by Indian Space Research Organization on the CUS15 platform.

It has no engine power or control left: it simply coasts until drag eventually brings it down.

How it got to space

Launch 2026-202, 3 Sept 2026, on a GSLV Mk II, from Satish Dhawan Space Centre, Sriharikota, India.

Identifiers

Catalogue number (NORAD number)
100608
Launch ID (COSPAR ID, or international designator)
2026-202B

As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.