Orbitarium Alerts

GSLV R/B

A spent rocket stage

Where it came from
The launch that carried NVS-03 (IRNSS-1L) (India, 2026).
Is it working?
Not a working satellite: a spent rocket stage.

In figures

How high
156–37,292 km. Above the Earth, from its lowest point to its highest.
One lap of the Earth
11 hours. 2.2 laps a day.
Launched
30 Oct 2026. On a GSLV Mk II.
How big
2.6 tonnes. At launch: 9.9 × 2.8 m.

How high and one lap: worked out from its orbit data of 17 Nov 2026, 11:59 UTC.

In plain English

It was launched on 30 October 2026 by a GSLV Mk II from Satish Dhawan Space Centre, Sriharikota, India, 20 days ago.

It flies in highly elliptical orbit, between 156 km and 37,292 km up, circling the Earth once every 11 hours, 2.2 laps a day. This stretched shape is a geostationary transfer orbit, the halfway step rockets use to deliver satellites to geostationary height. Its speed changes around each lap, from about 10.3 km per second at its lowest point to 1.5 km per second at its highest: an average of 3.4 km per second, about 12,100 km/h.

It weighed about 2,630 kg at launch and is 9.9 m long and 2.8 m across. It was built by Indian Space Research Organization on the CUS15 platform.

It has no engine power or control left: it simply coasts until drag eventually brings it down.

How it got to space

Launch 2026-245, 30 Oct 2026, on a GSLV Mk II, from Satish Dhawan Space Centre, Sriharikota, India.

Identifiers

Catalogue number (NORAD number)
101229
Launch ID (COSPAR ID, or international designator)
2026-245B

As of 19 Nov 2026, 03:17 UTC, when the satellite catalogue was last downloaded.