GSLV R/B
A spent rocket stage
- Where it came from
- The launch that carried NVS-03 (IRNSS-1L) (India, 2026).
- Is it working?
- Not a working satellite: a spent rocket stage.
In figures
- How high
- 156–37,292 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 11 hours. 2.2 laps a day.
- Launched
- 30 Oct 2026. On a GSLV Mk II.
- How big
- 2.6 tonnes. At launch: 9.9 × 2.8 m.
How high and one lap: worked out from its orbit data of 17 Nov 2026, 11:59 UTC.
In plain English
It was launched on 30 October 2026 by a GSLV Mk II from Satish Dhawan Space Centre, Sriharikota, India, 20 days ago.
It flies in highly elliptical orbit, between 156 km and 37,292 km up, circling the Earth once every 11 hours, 2.2 laps a day. This stretched shape is a geostationary transfer orbit, the halfway step rockets use to deliver satellites to geostationary height. Its speed changes around each lap, from about 10.3 km per second at its lowest point to 1.5 km per second at its highest: an average of 3.4 km per second, about 12,100 km/h.
It weighed about 2,630 kg at launch and is 9.9 m long and 2.8 m across. It was built by Indian Space Research Organization on the CUS15 platform.
It has no engine power or control left: it simply coasts until drag eventually brings it down.
How it got to space
Launch 2026-245, 30 Oct 2026, on a GSLV Mk II, from Satish Dhawan Space Centre, Sriharikota, India.
Identifiers
- Catalogue number (NORAD number)
- 101229
- Launch ID (COSPAR ID, or international designator)
- 2026-245B
As of 19 Nov 2026, 03:17 UTC, when the satellite catalogue was last downloaded.