MOLNIYA 1-40
A defence communications satellite
- Whose it is
- Main Space Forces Directorate (Soviet Union).
- Is it working?
- Status not known.
In figures
- How high
- 2,424–37,930 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 12 hours. 2 laps a day.
- Launched
- 2 Jun 1978. On a Molniya 8K78M.
- How big
- 1.7 tonnes. At launch: 4.4 × 1.4 m, 8.6 m across.
In plain English
It was launched on 2 June 1978 by a Molniya 8K78M from Plesetsk Missile and Space Complex, Russia, 48 years ago.
It flies in highly elliptical orbit, between 2,424 km and 37,930 km up, circling the Earth once every 12 hours, 2 laps a day. This is a Molniya orbit, tilted 64°: it lingers high over the far north for hours on each lap, covering regions geostationary satellites see poorly. Its speed changes around each lap, from about 8.7 km per second at its lowest point to 1.7 km per second at its highest: an average of 3.4 km per second, about 12,200 km/h.
Its job is communications.
It weighed about 1,650 kg at launch, is 4.4 m long and 1.4 m across and spans 8.6 m with its panels and antennas deployed. It was built by NPO Applied Mechanics on the Molniya-1 platform.
It is on the United Nations register of space objects, recorded in document ST/SG/SER.E/014 (registered by the Soviet Union).
How it got to space
Launch 1978-055, 2 Jun 1978, on a Molniya 8K78M, from Plesetsk Missile and Space Complex, Russia.
Identifiers
- Catalogue number (NORAD number)
- 10925
- Launch ID (COSPAR ID, or international designator)
- 1978-055A
- Also known as
- 11F658 No. 794-88-7-53
- UN registration document
- ST/SG/SER.E/014
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.