Orbitarium Alerts

SL-14 R/B

A spent rocket stage

Where it came from
The launch that carried METEOR 3-1 (the Soviet Union, 1985).
Is it working?
Not a working satellite: a spent rocket stage.

In figures

How high
1,222–1,249 km. Above the Earth, from its lowest point to its highest.
One lap of the Earth
110 minutes. 13.1 laps a day.
Launched
24 Oct 1985. On a Tsiklon-3.
How big
1.6 tonnes. At launch: 2.8 × 2.2 m.

In plain English

It was launched on 24 October 1985 by a Tsiklon-3 from Plesetsk Missile and Space Complex, Russia, 41 years ago.

It flies in low Earth orbit, about 1,236 km up, circling the Earth once every 110 minutes, 13.1 laps a day. Its 82.6° tilt takes it over (or very nearly over) both poles, so it eventually passes above every part of the Earth. That works out at an average of 7.2 km per second, about 26,000 km/h.

It weighed about 1,600 kg at launch and is 2.8 m long and 2.2 m across. It was built by Southern State Design Bureau on the S5M platform.

It has no engine power or control left: it simply coasts until drag eventually brings it down.

How it got to space

Launch 1985-100, 24 Oct 1985, on a Tsiklon-3, from Plesetsk Missile and Space Complex, Russia.

Identifiers

Catalogue number (NORAD number)
16194
Launch ID (COSPAR ID, or international designator)
1985-100B

As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.