Orbitarium Alerts

SOYUZ-TM 3 ORBIT MODULE

A satellite (the two catalogues disagree about this)

Whose it is
NPO Energiya (Soviet Union).
Still in orbit?
No: it came back down on 17 June 1988.

In figures

Launched
22 Jul 1987. On a Soyuz-U2.
How big
1.3 tonnes. At launch: 6.5 × 2.4 m. GCAT's figures, for what it counts as a component (a part such as a fairing, adapter or cover).

In plain English

It was launched on 22 July 1987 by a Soyuz-U2 from Baikonur Cosmodrome (Tyuratam), Kazakhstan and left orbit on 17 June 1988, 11 months later.

The last orbit on record before it came down was about 142 km up, tilted 51.6° to the equator, with one lap every 87 minutes. That final orbit is usually much lower than the one it worked in.

GCAT, which counts it as a component (a part such as a fairing, adapter or cover), records that it weighed about 1,280 kg at launch, is 6.5 m long and 2.4 m across and was built by NPO Energiya on the Soyuz BO platform.

How it got to space

Launch 1987-063, 22 Jul 1987, on a Soyuz-U2, from Baikonur Cosmodrome (Tyuratam), Kazakhstan.

Identifiers

Catalogue number (NORAD number)
18723
Launch ID (COSPAR ID, or international designator)
1987-063C

As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.