SL-6 R/B(2)
A spent rocket stage
- Where it came from
- The launch that carried MOLNIYA 1-75 (the Soviet Union, 1989).
- Is it working?
- Not a working satellite: a spent rocket stage.
In figures
- How high
- 796–38,394 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 11.6 hours. 2.1 laps a day.
- Launched
- 15 Feb 1989. On a Molniya 8K78M.
- How big
- 4.5 tonnes. At launch: 3.3 × 2.3 m.
In plain English
It was launched on 15 February 1989 by a Molniya 8K78M from Baikonur Cosmodrome (Tyuratam), Kazakhstan, nearly 38 years ago.
It flies in highly elliptical orbit, between 796 km and 38,394 km up, circling the Earth once every 11.6 hours, 2.1 laps a day. This is a Molniya orbit, tilted 63.6°: it lingers high over the far north for hours on each lap, covering regions geostationary satellites see poorly. Its speed changes around each lap, from about 9.8 km per second at its lowest point to 1.6 km per second at its highest: an average of 3.3 km per second, about 12,000 km/h.
It weighed about 4,500 kg at launch and is 3.3 m long and 2.3 m across. It was built by NPO Energiya on the Blok-L platform.
It has no engine power or control left: it simply coasts until drag eventually brings it down.
How it got to space
Launch 1989-014, 15 Feb 1989, on a Molniya 8K78M, from Baikonur Cosmodrome (Tyuratam), Kazakhstan.
Identifiers
- Catalogue number (NORAD number)
- 19810
- Launch ID (COSPAR ID, or international designator)
- 1989-014D
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.