SL-6 R/B(2)
A spent rocket stage
- Where it came from
- The launch that carried MOLNIYA 3-40 (the Soviet Union, 1991).
- Is it working?
- Not a working satellite: a spent rocket stage.
In figures
- How high
- 2,111–37,344 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 11.7 hours. 2.1 laps a day.
- Launched
- 22 Mar 1991. On a Molniya 8K78M.
- How big
- 4.5 tonnes. At launch: 3.3 × 2.3 m.
In plain English
It was launched on 22 March 1991 by a Molniya 8K78M from Plesetsk Missile and Space Complex, Russia, 35 years ago.
It flies in highly elliptical orbit, between 2,111 km and 37,344 km up, circling the Earth once every 11.7 hours, 2.1 laps a day. This is a Molniya orbit, tilted 64.4°: it lingers high over the far north for hours on each lap, covering regions geostationary satellites see poorly. Its speed changes around each lap, from about 8.9 km per second at its lowest point to 1.7 km per second at its highest: an average of 3.4 km per second, about 12,300 km/h.
It weighed about 4,500 kg at launch and is 3.3 m long and 2.3 m across. It was built by NPO Energiya on the Blok-L platform.
It has no engine power or control left: it simply coasts until drag eventually brings it down.
How it got to space
Launch 1991-022, 22 Mar 1991, on a Molniya 8K78M, from Plesetsk Missile and Space Complex, Russia.
Identifiers
- Catalogue number (NORAD number)
- 21199
- Launch ID (COSPAR ID, or international designator)
- 1991-022D
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.