SL-14 R/B
A spent rocket stage
- Where it came from
- The launch that carried METEOR 3-5 (the Soviet Union, 1991).
- Is it working?
- Not a working satellite: a spent rocket stage.
In figures
- How high
- 1,164–1,203 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 109 minutes. 13.2 laps a day.
- Launched
- 15 Aug 1991. On a Tsiklon-3.
- How big
- 1.6 tonnes. At launch: 2.8 × 2.2 m.
In plain English
It was launched on 15 August 1991 by a Tsiklon-3 from Plesetsk Missile and Space Complex, Russia, 35 years ago.
It flies in low Earth orbit, about 1,184 km up, circling the Earth once every 109 minutes, 13.2 laps a day. Its 82.6° tilt takes it over (or very nearly over) both poles, so it eventually passes above every part of the Earth. That works out at an average of 7.3 km per second, about 26,100 km/h.
It weighed about 1,600 kg at launch and is 2.8 m long and 2.2 m across. It was built by Southern State Design Bureau on the S5M platform.
It has no engine power or control left: it simply coasts until drag eventually brings it down.
How it got to space
Launch 1991-056, 15 Aug 1991, on a Tsiklon-3, from Plesetsk Missile and Space Complex, Russia.
Identifiers
- Catalogue number (NORAD number)
- 21656
- Launch ID (COSPAR ID, or international designator)
- 1991-056B
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.