Orbitarium Alerts

SL-6 R/B(2)

A spent rocket stage

Where it came from
The launch that carried MOLNIYA 3-42 (Russia, 1992).
Is it working?
Not a working satellite: a spent rocket stage.

In figures

How high
1,790–38,602 km. Above the Earth, from its lowest point to its highest.
One lap of the Earth
12 hours. 2 laps a day.
Launched
14 Oct 1992. On a Molniya 8K78M-PVB.
How big
4.5 tonnes. At launch: 3.3 × 2.3 m.

In plain English

It was launched on 14 October 1992 by a Molniya 8K78M-PVB from Plesetsk Missile and Space Complex, Russia, 34 years ago.

It flies in highly elliptical orbit, between 1,790 km and 38,602 km up, circling the Earth once every 12 hours, 2 laps a day. This is a Molniya orbit, tilted 64°: it lingers high over the far north for hours on each lap, covering regions geostationary satellites see poorly. Its speed changes around each lap, from about 9.1 km per second at its lowest point to 1.7 km per second at its highest: an average of 3.4 km per second, about 12,100 km/h.

It weighed about 4,500 kg at launch and is 3.3 m long and 2.3 m across. It was built by NPO Energiya on the Blok-L platform.

It has no engine power or control left: it simply coasts until drag eventually brings it down.

How it got to space

Launch 1992-067, 14 Oct 1992, on a Molniya 8K78M-PVB, from Plesetsk Missile and Space Complex, Russia.

Identifiers

Catalogue number (NORAD number)
22181
Launch ID (COSPAR ID, or international designator)
1992-067D

As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.