Orbitarium Alerts

SL-14 R/B

A spent rocket stage

Where it came from
The launch that carried METEOR 2-21 (Russia, 1993).
Is it working?
Not a working satellite: a spent rocket stage.

In figures

How high
935–968 km. Above the Earth, from its lowest point to its highest.
One lap of the Earth
104 minutes. 13.8 laps a day.
Launched
31 Aug 1993. On a Tsiklon-3.
How big
1.6 tonnes. At launch: 2.8 × 2.2 m.

In plain English

It was launched on 31 August 1993 by a Tsiklon-3 from Plesetsk Missile and Space Complex, Russia, 33 years ago.

It flies in low Earth orbit, about 952 km up, circling the Earth once every 104 minutes, 13.8 laps a day. Its 82.6° tilt takes it over (or very nearly over) both poles, so it eventually passes above every part of the Earth. That works out at an average of 7.4 km per second, about 26,500 km/h.

It weighed about 1,600 kg at launch and is 2.8 m long and 2.2 m across. It was built by Southern State Design Bureau on the S5M platform.

It has no engine power or control left: it simply coasts until drag eventually brings it down.

How it got to space

Launch 1993-055, 31 Aug 1993, on a Tsiklon-3, from Plesetsk Missile and Space Complex, Russia.

Identifiers

Catalogue number (NORAD number)
22784
Launch ID (COSPAR ID, or international designator)
1993-055C

As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.