TITAN 2G R/B
A spent rocket stage
- Where it came from
- The launch that carried CLEMENTINE 1 (DSPSE) (the United States, 1994).
- Still in orbit?
- No: it came back down on 13 February 1994.
In figures
- Launched
- 25 Jan 1994. On a Titan II SLV.
- How big
- 2.7 tonnes. At launch: 7.9 × 3.0 m.
In plain English
It was launched on 25 January 1994 by a Titan II SLV from Vandenberg Space Force Base, California, USA and left orbit on 13 February 1994, 19 days later.
The last orbit on record before it came down was about 170 km up, tilted 67° to the equator, with one lap every 88 minutes. That final orbit is usually much lower than the one it flew in before.
It weighed about 2,650 kg at launch and is 7.9 m long and 3 m across. It was built by Martin Marietta on the Titan Stage 2 platform.
How it got to space
Launch 1994-004, 25 Jan 1994, on a Titan II SLV, from Vandenberg Space Force Base, California, USA.
Identifiers
- Catalogue number (NORAD number)
- 22974
- Launch ID (COSPAR ID, or international designator)
- 1994-004B
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.