SL-14 R/B
A spent rocket stage
- Where it came from
- The launch that carried GONETS-D1 1 (Russia, 1996).
- Is it working?
- Not a working satellite: a spent rocket stage.
In figures
- How high
- 1,408–1,478 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 115 minutes. 12.6 laps a day.
- Launched
- 19 Feb 1996. On a Tsiklon-3.
- How big
- 1.6 tonnes. At launch: 2.8 × 2.2 m.
In plain English
It was launched on 19 February 1996 by a Tsiklon-3 from Plesetsk Missile and Space Complex, Russia, nearly 31 years ago.
It flies in low Earth orbit, about 1,443 km up, circling the Earth once every 115 minutes, 12.6 laps a day. Its 82.6° tilt takes it over (or very nearly over) both poles, so it eventually passes above every part of the Earth. That works out at an average of 7.1 km per second, about 25,700 km/h.
It weighed about 1,600 kg at launch and is 2.8 m long and 2.2 m across. It was built by Southern State Design Bureau on the S5M platform.
It has no engine power or control left: it simply coasts until drag eventually brings it down.
How it got to space
Launch 1996-009, 19 Feb 1996, on a Tsiklon-3, from Plesetsk Missile and Space Complex, Russia.
Identifiers
- Catalogue number (NORAD number)
- 23793
- Launch ID (COSPAR ID, or international designator)
- 1996-009G
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.