SL-26 R/B
A spent rocket stage
- Where it came from
- The launch that carried MERIDIAN 3 (Russia, 2010).
- Is it working?
- Not a working satellite: a spent rocket stage.
In figures
- How high
- 1,338–38,953 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 11.9 hours. 2 laps a day.
- Launched
- 2 Nov 2010. On a Soyuz-2-1A.
- How big
- 6.6 tonnes. At launch: 1.7 × 3.3 m.
In plain English
It was launched on 2 November 2010 by a Soyuz-2-1A from Plesetsk Missile and Space Complex, Russia, 16 years ago.
It flies in highly elliptical orbit, between 1,338 km and 38,953 km up, circling the Earth once every 11.9 hours, 2 laps a day. This is a Molniya orbit, tilted 63.8°: it lingers high over the far north for hours on each lap, covering regions geostationary satellites see poorly. Its speed changes around each lap, from about 9.4 km per second at its lowest point to 1.6 km per second at its highest: an average of 3.3 km per second, about 12,000 km/h.
It weighed about 6,600 kg at launch, is 1.7 m long and 3.3 m across and spans 3.3 m with its panels and antennas deployed. It was built by NPO Lavochkin on the Fregat platform.
It has no engine power or control left: it simply coasts until drag eventually brings it down.
How it got to space
Launch 2010-058, 2 Nov 2010, on a Soyuz-2-1A, from Plesetsk Missile and Space Complex, Russia.
Identifiers
- Catalogue number (NORAD number)
- 37213
- Launch ID (COSPAR ID, or international designator)
- 2010-058B
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.