EUTELSAT 7 WEST A
A commercial communications satellite
- Whose it is
- Eutelsat SA (European Telecommunications Satellite Organization (EUTELSAT)).
- Is it working?
- Working.
In figures
- How high
- 35,761–35,812 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 23.9 hours. As long as the Earth takes to turn once.
- Launched
- 24 Sept 2011. On a Zenit-3SL.
- How big
- 4.6 tonnes. At launch: 6.3 × 2.7 m, 39.0 m across.
How high and one lap: worked out from its orbit data of 19 Nov 2026, 13:45 UTC.
In plain English
It was launched on 24 September 2011 by a Zenit-3SL from Sea Launch Platform (mobile), 15 years ago.
It sits in geostationary orbit 35,786 km above the equator, where one lap takes exactly as long as the Earth takes to turn, so from the ground it appears to hang at one point in the sky. That works out at an average of 3.1 km per second, about 11,100 km/h.
Its job is communications. It is listed under Eutelsat: Eutelsat's fleet of geostationary communications satellites.
It weighed about 4,600 kg at launch, is 6.3 m long and 2.7 m across and spans 39 m with its panels and antennas deployed. It was built by Astrium (F) Toulouse on the Eurostar 3000 platform.
The catalogue lists it as operational.
It is on the United Nations register of space objects, recorded in document ST/SG/SER.E/643 (registered by France).
How it got to space
Launch 2011-051, 24 Sept 2011, on a Zenit-3SL, from Sea Launch Platform (mobile).
Identifiers
- Catalogue number (NORAD number)
- 37816
- Launch ID (COSPAR ID, or international designator)
- 2011-051A
- UN registration document
- ST/SG/SER.E/643
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.