GPM-CORE
A civil government Earth-science satellite
- Whose it is
- NASA Goddard Space Flight Center. The two catalogues disagree about this.
- Is it working?
- Working.
In figures
- How high
- 424–439 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 93 minutes. 15.4 laps a day.
- Launched
- 27 Feb 2014. On a H-IIA 202.
- How big
- 3.9 tonnes. At launch: 6.5 × 5.0 m, 13.0 m across.
How high and one lap: worked out from its orbit data of 19 Nov 2026, 04:25 UTC.
In plain English
It was launched on 27 February 2014 by a H-IIA 202 from Tanegashima Space Center, Japan, 12 years ago.
It flies in low Earth orbit, about 432 km up, circling the Earth once every 93 minutes, 15.4 laps a day. Its orbit is tilted 65° to the equator, so it passes over everywhere between 65° north and 65° south and never flies over places nearer the poles. That works out at an average of 7.7 km per second, about 27,500 km/h.
Its job is earth-observation science (research focus: atmospheric science). It is listed under Earth resources: Earth-observation satellites that monitor land, oceans and vegetation, such as Landsat and Sentinel. GCAT notes: "Climate study, rain/snow".
It weighed about 3,850 kg at launch, is 6.5 m long and 5 m across and spans 13 m with its panels and antennas deployed. It was built by NASA Goddard Space Flight Center on the GPM platform.
The catalogue lists it as operational.
GCAT has no record of it on the United Nations register of space objects yet; the United States would be expected to register it. Registrations often trail launches by months.
How it got to space
Launch 2014-009, 27 Feb 2014, on a H-IIA 202, from Tanegashima Space Center, Japan.
Identifiers
- Catalogue number (NORAD number)
- 39574
- Launch ID (COSPAR ID, or international designator)
- 2014-009C
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.