PSLV R/B
A spent rocket stage
- Where it came from
- The launch that carried DMC3-FM1 (India, 2015).
- Is it working?
- Not a working satellite: a spent rocket stage.
In figures
- How high
- 605–610 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 97 minutes. 14.9 laps a day.
- Launched
- 10 Jul 2015. On a PSLV-XL.
- How big
- 920 kg. At launch: 2.7 × 2.8 m.
In plain English
It was launched on 10 July 2015 by a PSLV-XL from Satish Dhawan Space Centre, Sriharikota, India, 11 years ago.
It flies in low Earth orbit, about 608 km up, circling the Earth once every 97 minutes, 14.9 laps a day. Its 98.2° tilt makes the orbit sun-synchronous: it passes over each part of the Earth at about the same local time every day. That works out at an average of 7.6 km per second, about 27,200 km/h.
It weighed about 920 kg at launch and is 2.7 m long and 2.8 m across. It was built by VSSC Liquid Propulsion Systems Center on the PS-4 platform.
It has no engine power or control left: it simply coasts until drag eventually brings it down.
How it got to space
Launch 2015-032, 10 Jul 2015, on a PSLV-XL, from Satish Dhawan Space Centre, Sriharikota, India.
Identifiers
- Catalogue number (NORAD number)
- 40720
- Launch ID (COSPAR ID, or international designator)
- 2015-032F
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.