PSLV R/B
A spent rocket stage
- Where it came from
- The launch that carried RESOURCESAT-2A (India, 2016).
- Is it working?
- Not a working satellite: a spent rocket stage.
In figures
- How high
- 809–814 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 101 minutes. 14.2 laps a day.
- Launched
- 7 Dec 2016. On a PSLV-XL.
- How big
- 920 kg. At launch: 2.7 × 2.1 m.
In plain English
It was launched on 7 December 2016 by a PSLV-XL from Satish Dhawan Space Centre, Sriharikota, India, nearly 10 years ago.
It flies in low Earth orbit, about 812 km up, circling the Earth once every 101 minutes, 14.2 laps a day. Its 98.6° tilt makes the orbit sun-synchronous: it passes over each part of the Earth at about the same local time every day. That works out at an average of 7.4 km per second, about 26,800 km/h.
It weighed about 920 kg at launch and is 2.7 m long and 2.1 m across. It was built by VSSC Liquid Propulsion Systems Center on the PS-4 platform.
It has no engine power or control left: it simply coasts until drag eventually brings it down.
How it got to space
Launch 2016-074, 7 Dec 2016, on a PSLV-XL, from Satish Dhawan Space Centre, Sriharikota, India.
Identifiers
- Catalogue number (NORAD number)
- 41878
- Launch ID (COSPAR ID, or international designator)
- 2016-074B
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.