SL-23 R/B
A spent rocket stage
- Where it came from
- The launch that carried ANGOSAT 1 (Russia, 2017).
- Still in orbit?
- No: it came back down on 27 January 2018.
In figures
- Launched
- 26 Dec 2017. On a Zenit-3SLBF.
- How big
- 8.3 tonnes. At launch: 10.4 × 3.9 m.
In plain English
It was launched on 26 December 2017 by a Zenit-3SLBF from Baikonur Cosmodrome (Tyuratam), Kazakhstan and left orbit on 27 January 2018, 32 days later.
The last orbit on record before it came down was about 139 km up, tilted 51.3° to the equator, with one lap every 87 minutes. That final orbit is usually much lower than the one it flew in before.
It weighed about 8,300 kg at launch and is 10.4 m long and 3.9 m across. It was built by Southern State Design Bureau on the 11S772 platform.
How it got to space
Launch 2017-086, 26 Dec 2017, on a Zenit-3SLBF, from Baikonur Cosmodrome (Tyuratam), Kazakhstan.
Identifiers
- Catalogue number (NORAD number)
- 43090
- Launch ID (COSPAR ID, or international designator)
- 2017-086D
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.