Transiting Exoplanet Survey Satellite
A civil government astronomy satellite
Catalogued as TESS
- Whose it is
- NASA Goddard Space Flight Center (United States).
- Is it working?
- Working.
In figures
- How high
- 119,094–364,455 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 341.7 hours
- Launched
- 18 Apr 2018. On a Falcon 9.
- How big
- 362 kg. At launch: 1.5 × 1.2 m, 3.7 m across.
In plain English
It was launched on 18 April 2018 by a Falcon 9 from Cape Canaveral / Kennedy Space Center, Florida, USA, 8 years ago.
It flies in highly elliptical orbit, between 119,094 km and 364,455 km up, circling the Earth once every 341.7 hours. Its orbit is tilted 56.2° to the equator, so it passes over everywhere between 56.2° north and 56.2° south and never flies over places nearer the poles. Its speed changes around each lap, from about 2.2 km per second at its lowest point to 0.7 km per second at its highest: an average of 1.2 km per second, about 4,300 km/h.
Its job is astronomy.
It weighed about 362 kg at launch, is 1.5 m long and 1.2 m across and spans 3.7 m with its panels and antennas deployed. It was built by Orbital ATK Space Systems Group (SSG) on the Leostar-2 platform.
The catalogue lists it as operational.
It is on the United Nations register of space objects, recorded in document ST/SG/SER.E/877 (registered by the United States).
How it got to space
Launch 2018-038, 18 Apr 2018, on a Falcon 9, from Cape Canaveral / Kennedy Space Center, Florida, USA.
Identifiers
- Catalogue number (NORAD number)
- 43435
- Launch ID (COSPAR ID, or international designator)
- 2018-038A
- UN registration document
- ST/SG/SER.E/877
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.