KHALIFASAT
A civil government optical imaging satellite
- Whose it is
- Mohammed bin Rashid Space Centre, EIAST (United Arab Emirates).
- Is it working?
- Working.
In figures
- How high
- 558–565 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 96 minutes. 15 laps a day.
- Launched
- 29 Oct 2018. On a H-IIA 202.
- How big
- 330 kg. At launch: 1.3 × 1.2 m, 3.0 m across.
How high and one lap: worked out from its orbit data of 19 Nov 2026, 14:24 UTC.
In plain English
It was launched on 29 October 2018 by a H-IIA 202 from Tanegashima Space Center, Japan, 8 years ago.
It flies in low Earth orbit, about 561 km up, circling the Earth once every 96 minutes, 15 laps a day. Its 98.1° tilt makes the orbit sun-synchronous: it passes over each part of the Earth at about the same local time every day, which gives its cameras and instruments the same lighting from one day to the next. That works out at an average of 7.6 km per second, about 27,300 km/h.
Its job is optical imaging.
It weighed about 330 kg at launch, is 1.3 m long and 1.2 m across and spans 3 m with its panels and antennas deployed. It was built by Mohammed bin Rashid Space Centre, EIAST and SatRec Initiative on the SI-300 platform.
The catalogue lists it as operational.
It is on the United Nations register of space objects, recorded in document ST/SG/SER.E/884 (registered by the United Arab Emirates).
How it got to space
Launch 2018-084, 29 Oct 2018, on a H-IIA 202, from Tanegashima Space Center, Japan.
Identifiers
- Catalogue number (NORAD number)
- 43676
- Launch ID (COSPAR ID, or international designator)
- 2018-084F
- UN registration document
- ST/SG/SER.E/884
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.