GSAT-29
A civil government communications satellite
- Whose it is
- Indian Space Research Organization.
- Is it working?
- Working.
In figures
- How high
- 35,771–35,802 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 23.9 hours. As long as the Earth takes to turn once.
- Launched
- 14 Nov 2018. On a GSLV Mk III.
- How big
- 3.4 tonnes. At launch: 3.1 × 1.8 m, 20.0 m across.
How high and one lap: worked out from its orbit data of 19 Nov 2026, 00:22 UTC.
In plain English
It was launched on 14 November 2018 by a GSLV Mk III from Satish Dhawan Space Centre, Sriharikota, India, 8 years ago.
It sits in geostationary orbit 35,787 km above the equator, where one lap takes exactly as long as the Earth takes to turn, so from the ground it appears to hang at one point in the sky. That works out at an average of 3.1 km per second, about 11,100 km/h.
Its job is communications. It is listed under Active geosynchronous: Active satellites in geosynchronous orbit, about 35,786 km up, where they stay over the same region of the Earth.
It weighed about 3,420 kg at launch, is 3.1 m long and 1.8 m across and spans 20 m with its panels and antennas deployed. It was built by ISRO Satellite Center on the I3K platform.
The catalogue lists it as operational.
It is on the United Nations register of space objects, recorded in document ST/SG/SER.E/889 (registered by India).
How it got to space
Launch 2018-089, 14 Nov 2018, on a GSLV Mk III, from Satish Dhawan Space Centre, Sriharikota, India.
Identifiers
- Catalogue number (NORAD number)
- 43698
- Launch ID (COSPAR ID, or international designator)
- 2018-089A
- UN registration document
- ST/SG/SER.E/889
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.