Orbitarium Alerts

LEMUR-2-BAXTER-OLIVER

A commercial communications satellite

Whose it is
Spire Global Luxembourg and Spire. The two catalogues disagree about this.
Still in orbit?
No: it came back down on 20 December 2021.

In figures

Launched
3 Oct 2020. On an Antares 230+, set loose in its own orbit later.
How big
5 kg. At launch: 0.3 × 0.1 m.

In plain English

It went into space on 3 October 2020 aboard an Antares 230+ from Wallops Island, Virginia, USA (launch 2020-069, CYGNUS NG-14), and was released into its own orbit later, on 5 November 2020. Because it was set loose in orbit rather than by its rocket, the tracking catalogue lists it under the launch number of the International Space Station, 1998-067. It left orbit on 20 December 2021, 13 months after it was released.

The last orbit on record before it came down was about 171 km up, tilted 51.6° to the equator, with one lap every 88 minutes. That final orbit is usually much lower than the one it worked in.

Its job is communications.

It weighed about 4.6 kg at launch and is 0.3 m long and 0.1 m across. It was built by Spire/Glasgow on the Cubesat 3U platform.

It is on the United Nations register of space objects, recorded in document A/AC.105/INF.445 (registered by Luxembourg).

How it got to space

Launch 2020-069, 3 Oct 2020, on an Antares 230+, from Wallops Island, Virginia, USA.

Identifiers

Catalogue number (NORAD number)
46925
Launch ID (COSPAR ID, or international designator)
1998-067RV
Also known as
LEMUR 2 V4.7
UN registration document
A/AC.105/INF.445

As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.