QASED R/B
A spent rocket stage
- Where it came from
- The launch that carried NOOR-2 (Iran, 2022).
- Still in orbit?
- No: it came back down on 25 April 2025.
In figures
- Launched
- 8 Mar 2022. On a Qased.
- How big
- 100 kg. At launch: 0.5 × 0.3 m.
In plain English
It was launched on 8 March 2022 by a Qased from Shahrud Missile Test Site, Iran and left orbit on 25 April 2025, 3 years later.
The last orbit on record before it came down was about 188 km up, tilted 58.3° to the equator, with one lap every 88 minutes. That final orbit is usually much lower than the one it flew in before.
It weighed about 100 kg at launch and is 0.5 m long and 0.3 m across. It was built by Sepah-e Pasdaran-e Enghelab-e Eslami (Missile Forces) on the Qased S3 platform.
How it got to space
Launch 2022-024, 8 Mar 2022, on a Qased, from Shahrud Missile Test Site, Iran.
Identifiers
- Catalogue number (NORAD number)
- 51955
- Launch ID (COSPAR ID, or international designator)
- 2022-024B
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.