GSLV R/B
A spent rocket stage
- Where it came from
- The launch that carried NVS-01 (IRNSS-1J) (India, 2023).
- Is it working?
- Not a working satellite: a spent rocket stage.
In figures
- How high
- 196–23,807 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 6.9 hours. 3.5 laps a day.
- Launched
- 29 May 2023. On a GSLV Mk II.
- How big
- 2.6 tonnes. At launch: 9.9 × 2.8 m.
In plain English
It was launched on 29 May 2023 by a GSLV Mk II from Satish Dhawan Space Centre, Sriharikota, India, 3 years ago.
It flies in highly elliptical orbit, between 196 km and 23,807 km up, circling the Earth once every 6.9 hours, 3.5 laps a day. Its orbit is tilted 19.3° to the equator, so it passes over everywhere between 19.3° north and 19.3° south and never flies over places nearer the poles. Its speed changes around each lap, from about 10 km per second at its lowest point to 2.2 km per second at its highest: an average of 4.1 km per second, about 14,900 km/h.
It weighed about 2,630 kg at launch and is 9.9 m long and 2.8 m across. It was built by Indian Space Research Organization on the CUS15 platform.
It has no engine power or control left: it simply coasts until drag eventually brings it down.
How it got to space
Launch 2023-076, 29 May 2023, on a GSLV Mk II, from Satish Dhawan Space Centre, Sriharikota, India.
Identifiers
- Catalogue number (NORAD number)
- 56760
- Launch ID (COSPAR ID, or international designator)
- 2023-076B
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.