SS3 R/B
A spent rocket stage
- Where it came from
- The launch that carried EOS-08 (India, 2024).
- Still in orbit?
- No: it came back down on 26 November 2025.
In figures
- Launched
- 16 Aug 2024. On a SSLV.
- How big
- 400 kg. At launch: 2.8 × 1.7 m.
In plain English
It was launched on 16 August 2024 by a SSLV from Satish Dhawan Space Centre, Sriharikota, India and left orbit on 26 November 2025, 15 months later.
The last orbit on record before it came down was about 169 km up, tilted 37.3° to the equator, with one lap every 88 minutes. That final orbit is usually much lower than the one it flew in before.
It weighed about 400 kg at launch and is 2.8 m long and 1.7 m across. It was built by Indian Space Research Organization on the SS-3 platform.
How it got to space
Launch 2024-147, 16 Aug 2024, on a SSLV, from Satish Dhawan Space Centre, Sriharikota, India.
Identifiers
- Catalogue number (NORAD number)
- 60457
- Launch ID (COSPAR ID, or international designator)
- 2024-147D
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.