Orbitarium Alerts

SEDNA-1

A commercial communications satellite

Whose it is
AAC Microtec/Clyde Space Ltd. The two catalogues disagree about this.
Is it working?
Working.

In figures

How high
534–546 km. Above the Earth, from its lowest point to its highest.
One lap of the Earth
95 minutes. 15.1 laps a day.
Launched
16 Aug 2024. On a Falcon 9.
How big
4 kg. At launch: 0.3 × 0.1 m.

How high and one lap: worked out from its orbit data of 19 Nov 2026, 05:22 UTC.

In plain English

It was launched on 16 August 2024 by a Falcon 9 from Vandenberg Space Force Base, California, USA, 2 years ago.

It flies in low Earth orbit, about 540 km up, circling the Earth once every 95 minutes, 15.1 laps a day. Its 97.7° tilt makes the orbit sun-synchronous: it passes over each part of the Earth at about the same local time every day. That works out at an average of 7.6 km per second, about 27,300 km/h.

Its job is communications.

It weighed about 4 kg at launch and is 0.3 m long and 0.1 m across. It was built by AAC Microtec/Clyde Space Ltd on the Cubesat 3U platform.

The catalogue lists it as operational.

GCAT has no record of it on the United Nations register of space objects yet; the United Kingdom would be expected to register it. Registrations often trail launches by months.

How it got to space

Launch 2024-149, 16 Aug 2024, on a Falcon 9, from Vandenberg Space Force Base, California, USA.

Identifiers

Catalogue number (NORAD number)
60580
Launch ID (COSPAR ID, or international designator)
2024-149DS

As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.