Orbitarium Alerts

CERES-1 R/B

A spent rocket stage

Where it came from
Launch 2024-153 (China, 2024).
Still in orbit?
No: it came back down on 23 December 2024.

In figures

Launched
29 Aug 2024. On a Gushenxing 1.
How big
150 kg. At launch: 2.0 × 1.2 m.

In plain English

It was launched on 29 August 2024 by a Gushenxing 1 from Yellow Sea Launch Area, China and left orbit on 23 December 2024, 4 months later.

The last orbit on record before it came down was about 146 km up, tilted 97.6° to the equator, with one lap every 87 minutes. That final orbit is usually much lower than the one it flew in before.

It weighed about 150 kg at launch and is 2 m long and 1.2 m across. It was built by Galactic Energy Co on the Edge platform.

How it got to space

Launch 2024-153, 29 Aug 2024, on a Gushenxing 1, from Yellow Sea Launch Area, China.

Identifiers

Catalogue number (NORAD number)
60751
Launch ID (COSPAR ID, or international designator)
2024-153G

As of 19 Nov 2026, 03:17 UTC, when the satellite catalogue was last downloaded.