GSLV R/B
A spent rocket stage
- Where it came from
- The launch that carried NVS-02 (IRNSS-1K) (India, 2025).
- Is it working?
- Not a working satellite: a spent rocket stage.
In figures
- How high
- 184–30,195 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 8.8 hours. 2.7 laps a day.
- Launched
- 29 Jan 2025. On a GSLV Mk II.
- How big
- 2.6 tonnes. At launch: 9.9 × 2.8 m.
In plain English
It was launched on 29 January 2025 by a GSLV Mk II from Satish Dhawan Space Centre, Sriharikota, India, 22 months ago.
It flies in highly elliptical orbit, between 184 km and 30,195 km up, circling the Earth once every 8.8 hours, 2.7 laps a day. This stretched shape is a geostationary transfer orbit, the halfway step rockets use to deliver satellites to geostationary height. Its speed changes around each lap, from about 10.1 km per second at its lowest point to 1.8 km per second at its highest: an average of 3.7 km per second, about 13,400 km/h.
It weighed about 2,630 kg at launch and is 9.9 m long and 2.8 m across. It was built by Indian Space Research Organization on the CUS15 platform.
It has no engine power or control left: it simply coasts until drag eventually brings it down.
How it got to space
Launch 2025-020, 29 Jan 2025, on a GSLV Mk II, from Satish Dhawan Space Centre, Sriharikota, India.
Identifiers
- Catalogue number (NORAD number)
- 62851
- Launch ID (COSPAR ID, or international designator)
- 2025-020B
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.