GSLV R/B
A spent rocket stage
- Where it came from
- The launch that carried NISAR (India, 2025).
- Is it working?
- Not a working satellite: a spent rocket stage.
In figures
- How high
- 725–740 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 99 minutes. 14.5 laps a day.
- Launched
- 30 Jul 2025. On a GSLV Mk II.
- How big
- 2.6 tonnes. At launch: 9.9 × 2.8 m.
In plain English
It was launched on 30 July 2025 by a GSLV Mk II from Satish Dhawan Space Centre, Sriharikota, India, 16 months ago.
It flies in low Earth orbit, about 733 km up, circling the Earth once every 99 minutes, 14.5 laps a day. Its 98.4° tilt makes the orbit sun-synchronous: it passes over each part of the Earth at about the same local time every day. That works out at an average of 7.5 km per second, about 27,000 km/h.
It weighed about 2,630 kg at launch and is 9.9 m long and 2.8 m across. It was built by Indian Space Research Organization on the CUS15 platform.
It has no engine power or control left: it simply coasts until drag eventually brings it down.
How it got to space
Launch 2025-163, 30 Jul 2025, on a GSLV Mk II, from Satish Dhawan Space Centre, Sriharikota, India.
Identifiers
- Catalogue number (NORAD number)
- 65054
- Launch ID (COSPAR ID, or international designator)
- 2025-163B
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.