LEAP-1
A commercial technology-demonstration satellite
- Whose it is
- Dhruva Space Pvt. Ltd. (India).
- Is it working?
- Working.
In figures
- How high
- 588–594 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 97 minutes. 14.9 laps a day.
- Launched
- 26 Aug 2025. On a Falcon 9.
- How big
- 25 kg. At launch: 0.3 × 0.3 m, 1.5 m across.
How high and one lap: worked out from its orbit data of 19 Nov 2026, 06:21 UTC.
In plain English
It was launched on 26 August 2025 by a Falcon 9 from Vandenberg Space Force Base, California, USA, 15 months ago.
It flies in low Earth orbit, about 591 km up, circling the Earth once every 97 minutes, 14.9 laps a day. Its 97.7° tilt makes the orbit sun-synchronous: it passes over each part of the Earth at about the same local time every day. That works out at an average of 7.6 km per second, about 27,200 km/h.
Its job is technology and training.
It weighed about 25 kg at launch, is 0.3 m long and 0.3 m across and spans 1.5 m with its panels and antennas deployed. It was built by Dhruva Space Pvt. Ltd on the P-30 platform.
The catalogue lists it as operational.
GCAT has no record of it on the United Nations register of space objects yet; India would be expected to register it. Registrations often trail launches by months.
How it got to space
Launch 2025-188, 26 Aug 2025, on a Falcon 9, from Vandenberg Space Force Base, California, USA.
Identifiers
- Catalogue number (NORAD number)
- 65321
- Launch ID (COSPAR ID, or international designator)
- 2025-188G
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.