LEMUR-2-JULIA-JOEL
A commercial communications satellite
- Whose it is
- Spire. The two catalogues disagree about this.
- Is it working?
- Working.
In figures
- How high
- 584–589 km. Above the Earth, from its lowest point to its highest.
- One lap of the Earth
- 96 minutes. 14.9 laps a day.
- Launched
- 30 Mar 2026. On a Falcon 9.
- How big
- 8 kg. At launch: 0.3 × 0.1 m, 1.0 m across.
How high and one lap: worked out from its orbit data of 19 Nov 2026, 09:50 UTC.
In plain English
It was launched on 30 March 2026 by a Falcon 9 from Vandenberg Space Force Base, California, USA, 8 months ago.
It flies in low Earth orbit, about 587 km up, circling the Earth once every 96 minutes, 14.9 laps a day. Its 97.8° tilt makes the orbit sun-synchronous: it passes over each part of the Earth at about the same local time every day. That works out at an average of 7.6 km per second, about 27,200 km/h.
Its job is communications.
It weighed about 7.6 kg at launch, is 0.3 m long and 0.1 m across and spans 1 m with its panels and antennas deployed. It was built by Spire/Glasgow on the Cubesat 3U platform.
The catalogue lists it as operational.
GCAT has no record of it on the United Nations register of space objects yet; the United States would be expected to register it. Registrations often trail launches by months.
How it got to space
Launch 2026-067, 30 Mar 2026, on a Falcon 9, from Vandenberg Space Force Base, California, USA.
Identifiers
- Catalogue number (NORAD number)
- 68476
- Launch ID (COSPAR ID, or international designator)
- 2026-067BN
As of 19 Nov 2026, 15:22 UTC, when the satellite catalogue was last downloaded.